June 9, 2026

Kensite teams up with Rosslee Construction for school project

Working on a school site demands more than competence.

Some sites demand a different kind of care.

St Mary's RC Primary School in Oswaldtwistle is one of them.

Kensite is on site supporting Rosslee Construction — a Lancashire-based contractor who have been delivering education projects across the county since 1977. They know better than most what working in and around a school requires.

It isn't just technical competence. It's sensitivity. Professionalism. A setup that respects the community it sits within.

That starts with welfare. And that's why they called Kensite.

What Kensite delivered

A fully branded, compliant welfare compound — ready from day one.

→ Canteen→ Drying room→ Gents facilities

Everything in place before the first tool hit the ground.

When the community is watching

On a school site, the eyes are always on you.

Parents dropping off. Teachers walking past. Pupils watching from classrooms. The welfare compound isn't a box to tick — it's a public statement of the standards a contractor operates to.

Rosslee's standards are high. The Kensite setup reflects that.

OTHER ARTICLES

Kensite delivers for M Group and Prospect Homes

Kensite delivers premium welfare and office infrastructure for M Group NW on Prospect Homes scheme in Blackburn

Read Study Case

Top Features Every Modern Cabin Should Have

Not all cabins are built equally. We highlight the must-have features that ensure comfort, safety, and long-term usability.

Article card — black cabin being installed on a construction site.
Read Study Case

Case Study: Delivering Cabins for a Major Road Project

When deadlines were tight, Kensite stepped in. See how our fast response and reliable cabins kept a high-pressure road project on track.

Article card — aerial view of a road project with Kensite welfare cabins.
Read Study Case

The Real Cost of Delayed Cabin Delivery

A late cabin doesn’t just slow down progress—it can add thousands to project costs. Learn why reliability is the key to saving time and money.

Hand using tablet for logistics planning, representing delivery efficiency.
Read Study Case

Why Site Cabins Matter More Than You Think

Site cabins aren’t just temporary structures—they’re the backbone of efficient, safe, and well-managed construction projects. Here’s why no site can run smoothly without them.

Highway infrastructure image for “Why Site Cabins Matter” article.
Read Study Case

How to Choose the Right Welfare Unit for Your Team

Not all welfare units are the same. We break down the options and help you pick the right size, layout, and features to support your workers.

Bright yellow welfare cabin for “How to Choose the Right Welfare Unit.”
Read Study Case
GET A QUOTE

Getting ready to mobilise? Let's plan your temporary set up together today.

Speak to our Hire Team