Kensite delivers Premium Welfare standards on Yorkshire scheme
Atherton-based site welfare specialist demonstrates its North West standard travels nationally, following delivery on an Artium Construction scheme in Yorkshire.


Every summer, the construction calendar shifts. Schools close for six weeks and cram a year's worth of maintenance, resurfacing and building work into the gap. Councils and facilities teams push through jobs that can't happen while pupils are on site. Small maintenance and groundworks contractors pick up a run of short, sharp jobs that need to be in and out fast.
None of that fits the traditional static welfare cabin model - delivered by plant lorry, installed, and left in place for months regardless of how long the job actually takes. For a two-week school resurfacing job or a quick maintenance contract, that's welfare provision that costs more than the job justifies.
It's why we're seeing growing demand for our 12ft Eco Hybrid Mobile Welfare Unit, a towable welfare solution built for exactly this kind of work.
At 3.65m long, 2.3m wide and 1,675kg net, the unit is compact enough to tow onto site, position, and tow straight back off again once the job's complete — no specialist plant, no lengthy installation, no welfare provision sitting idle after the work's finished.
Inside, it doesn't compromise on what a crew actually needs:
CDM 2015 welfare requirements don't scale down for short-duration or small-footprint jobs — a three-day job carries the same obligation to provide proper welfare as a three-month one. The towable format means contractors can now meet that obligation without over-provisioning, or worse, under-providing because a static unit felt disproportionate to the job.
The 12ft Eco Hybrid is proving particularly well suited to:
As the summer maintenance season ramps up, get your welfare provision sorted before the work starts — not scrambled together once it has.
Get in touch: enquiries@kensite.co.uk | 01942 878 747